CMM Room installation

Project Summary

This project was to build an CMM Room roughly 3,000SF inside the existing Trenton engine plant for future line relocation of equipment to a controlled temperature environment.  The construction required structure steel, pre-engineered wall system, high speed overhead doors, glazing, architectural finishes, and epoxy floors.  The project was completed on schedule with good coordination of equipment relocations working with FCA.