Waterfront and Building Improvements

Project Summary

This project required complete interior/exterior remodel of existing boat house and existing dock system.  New piles were driven to replace the old dock piers along with new dock system decking was installed.  The boat house had some of the existing foundation timbers removed and replaced along with new decking and guiderails for pulling in the boats.  All this work was done while allowing the USCG’s station to perform their daily operations and activities.