CMM Room installation
Project Summary
This project was to build an CMM Room roughly 3,000SF inside the existing Trenton engine plant for future line relocation of equipment to a controlled temperature environment. The construction required structure steel, pre-engineered wall system, high speed overhead doors, glazing, architectural finishes, and epoxy floors. The project was completed on schedule with good coordination of equipment relocations working with FCA.
Project Summary
This project was to build an CMM Room roughly 3,000SF inside the existing Trenton engine plant for future line relocation of equipment to a controlled temperature environment. The construction required structure steel, pre-engineered wall system, high speed overhead doors, glazing, architectural finishes, and epoxy floors. The project was completed on schedule with good coordination of equipment relocations working with FCA.